News Flash • Walton County Public Works Update
Walton County Public Works Update
Walton County Public Works is pleased to share the latest news regarding our ongoing infrastructure projects. All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution when traveling through a work zone and to watch for construction workers and equipment entering and existing the roadway.
In-house crews have been hard at work on improving county infrastructure. Here are the latest progress and highlights from these important efforts.
GIRL SCOUT ROAD RESURFACING PROJECT
Project Improvements:
• Resurfacing 2.54-miles section of Girl Scout Road, extending from Hwy 90 W to the end of pavement
• Clipping the shoulder with Grader in preparation for paving
• Pavement Striping
Current Status:
• Under Construction (clipping the shoulder)
Traffic Impacts:
Intermittent shoulder and lane closures are anticipated throughout the duration of the project.
BEAVER DAM PARK IMPROVEMENT PROJECT
Project Improvements:
• Installation of a stormwater retention pond on a 0.15-acre site with sod
• Parking lot with 16 standard parking spaces and 2 designated handicap accessible spaces
• Stormwater inlet with 104-foot pipe to discharge collected stormwater to retention pond
Current Status:
• Under Construction
General Information:
• This project was designed by Walton County Engineering Department
• This project is funded through the Florida Recreation Development Assistance Program (FRDAP).
JOHN WHITE ROAD PHASE I DIRT-TO-PAVE PROJECT
Project Improvements:
• Paving 2,600-foot section of John White Road, extending from Dewey Drive to Caswell Drive.
• Drainage Improvements
• Stabilization
• Installation of new sod in right-of-way
• Pavement Striping
Current Status:
• Completed
Traffic Impacts:
• Intermittent shoulder and lane closures are anticipated throughout the duration of the project.
FOREST SHORE DRAINAGE IMPROVEMENTS
Project Improvements:
• Drainage system along Forest Shore Road
• Construction of a new sidewalk
• Installation of new sod in right-of-way
Current Status:
• Under Construction
General Information:
• This project was designed by Kimley-Horn
• This project is funded through the South Walton Infrastructure Funds and $400,000 from the Sidewalk Funds
CANNON DRIVE RESURFACING PROJECT
Project Improvements:
• Paving 1.03-mile section of Cannon Drive, extending from Adams Street to County Highway 147W
• Pavement Striping
Current Status:
• Completed
GEORGE MONTGOMERY ROAD RESURFACING PROJECT
Project Improvements:
• Paving 2,600-foot section of John White Road, extending from Dewey Road to Caswell Road
• Drainage Improvements
• Stabilization
• Pavement Striping
Current Status:
• Under Construction
Traffic Impacts:
Intermittent shoulder and lane closures are anticipated throughout the duration of the project.
ADDITIONAL PROJECTS
• Ghentsville Park PH II Walking Path
• New Paxton Medical Facility Drainage
• E Laurel Hill Avenue Drainage Project